Home page
Company data
Activities
Where to find us
Technikal data
Power factor correction
References

Reference installations related to the improvement of the electrical energy quality, performed during 2001 / 2002:

 

 

CUSTOMER- INSTALLATION

ACTIVITY- EQUIPMENT

1.

Iskra Co., maintenance dept., transformer station TP6

Measurement of the actual situation in the network, design, assembling, installation, and commissioning of the low voltage power factor correction equipment, filter version: automatic 360kvar/400V, fixed 45kvar/400V

2.

Airport Ljubljana, transformer station TP2

Measurement of the actual situation in the network, design, assembling, installation, and commissioning of the low voltage power factor correction equipment, filter version: automatic 400kvar/400V, fixed.2x35kvar/400V

3.

Textile mill Co, Sodražica, transformer station "DONIT"

Measurement of the actual situation in the network, design, assembling, installation, and commissioning of the low voltage power factor correction equipment, filter version: automatic 360kvar/400V, fixed 45kvar/400V

4.

FILC Co., Mengeš, Factory LENDAVA

Assembling, installation, and commissioning of the main switch board 1000A/400V and of the power factor correction equipment, automatic 200kvar/400V

5.

PFLEIDERER NOVOTERM Co., Novo Mesto, transformer station TP1

Measurement of the actual situation in the network, design, assembling, installation, and commissioning of the low voltage power factor correction equipment, filter version: automatic 2x600kvar and 1 x 900 kvar/400V

6.

PFLEIDERER NOVOTERM Co., Novo Mesto, transformer station TP1

Measurement of the actual situation in the network, design, assembling, installation, and commissioning of the medium voltage power factor correction equipment, filter version: fixed 1200kvar/20kV

7.

RTC KRVAVEC,

Transformer stations: - -KABINSKA ŽIČNICA

- KRŽIŠE

- ZVOH

Measurement of  both energy and harmonics parameters, electrical network analysis, proposals <O:P improvement of the situation in the electro-energetic system.

8.

Electrical utility Kranj, transformer station LABORE 110/20/10 kV

Performance of the project documentation for power correction equipment:<O:P</O:P

for Tr1.: 1 x 2,4Mvar, 21kV

for Tr2.: 1 x 2,4Mvar, 21kV<O:P</O:P

for Tr3.: 1 x 3,6Mvar, 21kV<O:P</O:P

9.

RUDNIK TRBOLJE – HRASTNIK

unit SEPARACIJA TRBOVLJE

Assembling, installation, and commissioning of the medium voltage power factor correction equipment; 1 x 0.6Mvar/6kV<O:P + 4 x 0.9Mvar/3kV

10.

ETRA ČRNUČE

Performance of the project documentation for medium voltage power factor correction equipment 20Mvar, 6kV

11.

ELCOM Domžale

for ŽIČNICA VOGEL

Performance of the project documentation for low voltage power factor correction equipment, filter version, automatic 830kvar/400V

12.

Electrical utility Kranj, for ski lift VOGEL

Assembling, installation, and commissioning of the medium voltage power factor correction equipment, filter version, automatic 830kvar/400V

13.

ETRA Co., Ljubljana

Assembling, installation, and commissioning of the medium voltage power factor correction equipment 20Mvar/6kV

14.

RTC KRVAVEC<O:P</O:P, -TP ZVOH, Transformer station KABINSKA ŽIČNICA

Assembling, installation, and commissioning of the low voltage power factor correction equipment , filter version, automatic 750kvar/400V<O:P</O:P, automatic 250kvar/400V

15.

Papirnica KOLIČEVO

Performance of the project documentation for low voltage power factor correction equipment, filter version, automatic 800kvar/400V

16.

KRKA ZDRAVILA, TP 2 – 4x1000kVA, 20/0,4kV

Performance of the reconstruction of the low voltage power factor equipment, filter version, automatic 600kvar, 400V

17.

Papirnica VEVČE

Performance of the technical documentation, assembling, installation, and commissioning of the medium  voltage power factor correction equipment  filter version; 2400kvar, 6kV

18.

ELEKTRO Ljubljana,

For transformer station ŽIRI 110/20 kV

Performance of the technical documentation, assembling, installation, and commissioning of the medium  voltage power factor correction equipment  filter version; 2400kvar, 20 kV 

19.

ACRONI JESENICE,

Transformer station JEKLARNA

Measurement of the actual situation in the network, analysis of the network situation, proposals for the improvement network situation 110kV, 35kV in 11kV

   20.

ELEKTRO Kranj<O:P</O:P

For transformer station LABORE 110/20/10kV

Assembling, installation, and commissioning of the power factor correction equipment:

Tr1.: 1 x 2,4Mvar, 21kV

Tr2.: 1 x 2,4Mvar, 21kV

Tr3.: 1 x 3,6Mvar, 21kV

21.

ACRONI JESENICE,

Transformer station JEKLARNA 110/335/11kV

Reconstruction of the power factor capacitor group, second harmonic, 11kV

22.

IMPOL Slovenska Bistrica

Measurement of the actual situation in the network, both energy and harmonics parameters,  analysis of the network situation, proposals for the improvement of the electrical energy quality

23.

ELEKTRO CELJE

for transformer station VUZENICA 110/20kV

Performance of the technical documentation, assembling, installation, and commissioning of the medium  voltage power factor correction equipment: 2400kvar, 20kV

 The full reference list can be obtained on request, phone ++ 386 01 563 14 62 or e-mail: info@elim.si.

 

Copyright © 2007 by  ELIM d.o.o. Ljubljana